PowerSafeEngineering

Licensed Professional Engineers

Nationwide Arc Flash Studies & NFPA 70E Compliance, Engineered by Licensed PEs

Field-verified data collection, IEEE 1584 incident energy modeling, and equipment labeling — delivered as a sealed report that stands up to an OSHA inspection.

2,400+
Buses modeled
3 weeks
Typical turnaround
100%
PE-sealed reports
Medium-voltage switchgear lineup with an NFPA 70E arc flash warning label applied, in a facility electrical room
NFPA 70EIEEE 1584OSHA 1910.333NEC 110.16Licensed PEsNationwide Service

An out-of-date study is a liability you already own

NFPA 70E 130.5 requires that the arc flash risk assessment be reviewed at least every five years, and again after a system change that could affect the results. Three things happen when it isn't.

$16,550

OSHA citation exposure

Per serious violation under 1910.333. Willful findings run roughly ten times higher, and citations can be written per exposed employee.

$1.5M

Average arc flash injury

Direct medical and litigation cost of one serious burn incident. Before downtime, replacement gear, or what it does to your experience modifier.

5 yrs

Failed compliance audit

Insurers, corporate EHS, and general contractors all ask for the assessment date now. An expired report stalls renewals and holds up work.

Power system studies, one coordinated model

We build your system model once — every additional study reuses it.

Arc Flash Study

Incident energy at every bus per IEEE 1584. Labels printed and installed on your equipment.

Short Circuit Analysis

Available fault current at every bus, checked against equipment interrupting and withstand ratings.

Selective Coordination

Time-current curves and settings so a downstream fault trips the nearest device, not the main.

Load Flow & Voltage Drop

Steady-state loading, transformer capacity, and the voltage that reaches the end of a feeder.

Condition Assessment

Infrared thermography under load, plus visual inspection. Findings ranked by severity.

Electrical Design

Power distribution design and load calculations. Permit-ready drawings, sealed for your jurisdiction.

Why facility engineers choose PowerSafe

We are an engineering firm, not a label printer. Every study is collected in the field by our own crew and sealed by the PE who reviewed it.

Request a Free Consultation
100%
Field-collected data

No study built from as-builts alone. We open the gear ourselves.

48 hr
Fixed-fee proposal

A written scope and a price. Not an hourly estimate.

40+
Years combined PE experience

Industrial, healthcare, data center, and municipal systems.

Yours
Model files released

You keep the SKM model. No hostage renewals.

Sample deliverable

See exactly what ships to you

A redacted client report: sealed cover sheet, field-verified one-line, incident energy tables, PPE requirements, and the labels that go on your gear. Read it before you talk to us. No form to fill out.

  • PE-sealed report, PDF and bound hard copy
  • Arc flash labels, printed and installed
  • Recommended protective device settings
  • Native model files (SKM)
View the sample report
A bound, PE-sealed PowerSafe arc flash study report
A sample time-current coordination plot from a PowerSafe SKM study
A sample NFPA 70E arc flash warning label produced by PowerSafe
Arc flash warning labels installed on switchgear after a PowerSafe study

How an engagement runs

1

Scope & fixed fee

Send a one-line, a panel schedule, or just a device count. A written fixed-fee proposal comes back within two business days.

2

Field data collection

Our engineers document every device, conductor, and as-found setting, scheduled around your shutdown window rather than ours.

3

Sealed report & labels

PE-sealed study, recommended settings, labels installed on the gear. Then we walk your team through what we found.

What clients say

PSE was super personable and easy to talk to. Their arc flash study was spot on, catching issues we missed and saving my company money. The team was super knowledgeable and efficient, explaining everything clearly. Now we're confident our systems are safe and compliant. Highly recommend them!
PowerSafe Engineering client
I am so glad we did this. They saved us money and significantly improved our facility's electrical safety and reliability. Their expertise and clear recommendations made compliance straightforward and effective. Highly recommended.
PowerSafe Engineering client
Thank you, Dalton, for working on this project with us. You were a tremendous help to us prepare for our audit coming up.
PowerSafe Engineering client

Frequently asked

Still have a question? Call (571) 310-6945 and talk to an engineer, not a rep.

NFPA 70E 130.5 requires the risk assessment to be reviewed at least every five years, and sooner whenever a change to the system could affect the results — a new transformer, a new service, or a utility upgrade.

Find out where your facility stands.

A 10-minute call with a licensed PE — we'll tell you what your study should cover and what it should cost. No obligation.

Call (571) 310-6945Free Consultation